ISO 9001:2000 Certified


907 Bains Street
Brookshire, TX 77423
Ph: 281 934 1500
Fax: 281 934 1600
 



 
  OTC-18614-PP Using BOPs at Pressures in Excess of the Rated Working Pressure - A Solution for High Pressure Wells?
(Abstract)
  By Michael Montgomery and Jeff Sattler with WEST and Sharon Buffington with the U.S. Minerals Management Service, for the Offshore Technology Conference, April 2007.
  Assessment of the Acceptability and safety of Using Equipment, Particularly BOP and Wellhead Components at Pressures in Excess of the Rated Working Pressure (Summary)

  By Michael Montgomery and Jeff Sattler for the U.S. Minerals Management Service, July 2006.
 

AADE-05-NTCE-76 Hydrostatic and Water Hammer Effects on Subsea Control Systems (Abstract)

  By Tom Thrash, Gilmore Valve and Raleigh Williamson, WEST for the AADE National Technical Conference, April 2005.
  AADE-05-NTCE-38 Innovations in Rig Surveys Increase Reliability
(Abstract)
  By Jeff Sattler for the AADE National Technical Conference, April 2005.
 

SPE 87957 Avoiding Drilling Equipment Downtime - Four Case Studies (Abstract)

  By Jeff Sattler and Bob Reed for the IADC/SPE Asia Pacific Drilling Technology Conference, September 2004.
 

SPE 87157 Qualitative Risk Analysis of Emergency BOP Control Systems to Ensure Availability (Abstract)

  By Jeff Sattler and Ed Lewis for the IADC/SPE Drilling conference, March 2004.
  Evaluation of Secondary Intervention Methods in Well Control (Summary)
  
  By Michael Montgomery for the U.S. Minerals Management Service, March 2003.
 

SPE 79837 Dropped BOP Stacks: Understanding Causes to Improve Prevention (Abstract)
 

  By Jeff Sattler for the SPE/IADC Drilling Conference, February 2003.
  
 

Review of Shear Ram Capabilities
(Summary)

  By Greg Childs and Raleigh Williamson for the U.S. Minerals Management Service, February 2003.
  
  SPE 74469 BOP Subsea Hydraulic Accumulator Energy Availability,
How to Ensure You Have What You Need
(Abstract)
  
  By Jeff Sattler for the IADC/SPE Drilling conference, February 2002.
  SPE 74471 Using Predictive Testing to Circumvent Blowout Prevention Equipment Downtime (Abstract)

  
  By Michael Montgomery for the IADC/SPE Drilling conference, February 2002.
  Evaluation of the Suitability of Industry Standards as MMS Requirements (Summary)   By Michael Montgomery for the U.S. Minerals Management Service, October 2000.
 
  Drill Through Equipment Considerations for Deepwater Drilling Adobe Acrobat 4.05 Format, 175 KB
  
  By Michael Montgomery for ETCE/OMAE 2000 Joint Conference, Energy for the Millennium, February 2000.
  Drilling Well Control Practices and Equipment Considerations for Deepwater Operations Plans Adobe Acrobat 4.05 Format, 155KB
  

  By Michael Montgomery and Colin Leach for Offshore Technology Conference, May 1999.
  Choke and Kill Lines - Safety and Downtime Adobe Acrobat 4.05 Format, 52 KB
  
  By Michael Montgomery for IADC Deepwater Conference, August 1998.
  SPE 36391 Certification - The Same as Fitness for Purpose? (Abstract)
  
  
  By Michael Montgomery for IADC/SPE Asia Pacific Drilling Technology Conference, September 1996.
  Inspection Quality Depends on People, Procedures and Policies Adobe Acrobat 4.05 Format, 41KB
  
  By Greg Childs for IADC/SPE Asia Pacific Drilling Technology Conference, September 1996.
  More BOP Equipment HPHT Considerations Adobe Acrobat 4.05 Format, 491 KB
  
  By Michael Montgomery for IADC Aberdeen Conference, May 1996.
  Inspection and Testing Procedures Improve BOPs for HPHT Drilling Adobe Acrobat 4.05 Format, 144 KB
  
  By Michael Montgomery published in the February 6, 1995 edition of the Oil & Gas Journal.
  Testing Improves Surface BOP Equipment Reliability Adobe Acrobat 4.05 Format, 32KB
  
  By Michael Montgomery for AADE Spring Technical Conference, April 1993.
   
   If you need the Acrobat Reader, please visit Adobe Systems, Inc.