| |
| |
OTC-18614-PP
Using BOPs at Pressures in Excess of the Rated Working Pressure -
A Solution for High Pressure Wells?
(Abstract)
|
|
By
Michael Montgomery and Jeff Sattler with WEST and Sharon Buffington
with the U.S. Minerals Management Service, for the Offshore Technology
Conference, April 2007.
|
| |
Assessment
of the Acceptability and safety of Using Equipment, Particularly BOP
and Wellhead Components at Pressures in Excess of the Rated Working
Pressure
(Summary)
|
|
By
Michael Montgomery and Jeff Sattler for the U.S. Minerals Management
Service, July 2006. |
| |
AADE-05-NTCE-76
Hydrostatic and Water Hammer Effects on Subsea Control Systems
(Abstract)
|
|
By
Tom Thrash, Gilmore Valve and Raleigh Williamson, WEST for the AADE
National Technical Conference, April 2005. |
| |
AADE-05-NTCE-38
Innovations in Rig Surveys Increase Reliability
(Abstract) |
|
By
Jeff Sattler for the AADE National Technical Conference, April 2005. |
| |
SPE
87957 Avoiding Drilling Equipment Downtime - Four Case Studies
(Abstract)
|
|
By
Jeff Sattler and Bob Reed for the IADC/SPE Asia Pacific Drilling Technology
Conference, September 2004. |
| |
SPE
87157 Qualitative Risk Analysis of Emergency BOP Control Systems
to Ensure Availability (Abstract)
|
|
By
Jeff Sattler and Ed Lewis for the IADC/SPE Drilling conference, March
2004. |
| |
Evaluation
of Secondary Intervention Methods in Well Control
(Summary)
|
|
By
Michael Montgomery for the U.S. Minerals Management Service, March
2003. |
| |
SPE
79837 Dropped BOP Stacks: Understanding Causes to Improve Prevention
(Abstract)
|
|
By
Jeff Sattler for the SPE/IADC Drilling Conference, February 2003.
|
| |
Review
of Shear Ram Capabilities
(Summary)
|
|
By
Greg Childs and Raleigh Williamson for the U.S. Minerals Management Service, February 2003.
|
| |
SPE
74469 BOP Subsea Hydraulic Accumulator Energy Availability,
How to Ensure You Have What You Need
(Abstract)
|
|
By
Jeff Sattler for the IADC/SPE Drilling conference, February 2002. |
| |
SPE
74471 Using Predictive Testing to Circumvent Blowout Prevention Equipment
Downtime (Abstract)
|
|
By Michael Montgomery for the IADC/SPE Drilling conference, February
2002. |
| |
Evaluation
of the Suitability of Industry Standards as MMS Requirements
(Summary) |
|
By
Michael Montgomery for the U.S. Minerals Management Service, October
2000.
|
| |
Drill
Through Equipment Considerations for Deepwater Drilling Adobe
Acrobat 4.05 Format, 175 KB
|
|
By
Michael Montgomery for ETCE/OMAE 2000 Joint Conference, Energy for
the Millennium, February 2000.
|
| |
Drilling
Well Control Practices and Equipment Considerations for Deepwater
Operations Plans Adobe
Acrobat 4.05 Format, 155KB
|
|
By
Michael Montgomery and Colin Leach for Offshore Technology Conference,
May 1999.
|
| |
Choke
and Kill Lines - Safety and Downtime Adobe
Acrobat 4.05 Format, 52 KB
|
|
By
Michael Montgomery for IADC Deepwater Conference, August 1998. |
| |
SPE
36391 Certification - The Same as Fitness for Purpose? (Abstract)
|
|
By
Michael Montgomery for IADC/SPE Asia Pacific Drilling Technology Conference,
September 1996.
|
| |
Inspection
Quality Depends on People, Procedures and Policies
Adobe Acrobat 4.05 Format, 41KB
|
|
By
Greg Childs for IADC/SPE Asia Pacific Drilling Technology Conference,
September 1996.
|
| |
More
BOP Equipment HPHT Considerations Adobe
Acrobat 4.05 Format, 491 KB
|
|
By
Michael Montgomery for IADC Aberdeen Conference, May 1996. |
| |
Inspection
and Testing Procedures Improve BOPs for HPHT Drilling
Adobe Acrobat 4.05 Format, 144 KB
|
|
By
Michael Montgomery published in the February 6, 1995 edition of the
Oil & Gas Journal. |
| |
Testing
Improves Surface BOP Equipment Reliability Adobe
Acrobat 4.05 Format, 32KB
|
|
By
Michael Montgomery for AADE Spring Technical Conference, April 1993.
|
| |
|
| |
If
you need the Acrobat Reader, please visit Adobe
Systems, Inc. |